Project Description

Beverly Hills Plaza Hotel contracted PCS Energy to design and build a 150 kW rooftop solar array. This project required a high level or coordination between hotel management and PCS Energy to ensure hotel guest were not inconvenienced. Special attention was given to the design of the system to keep the visual appearance of the solar system minimized.

  • 485 – 310W LG Modules
  • 5 – SMA Sunny Tripower Inverter
  • Cellular Data Monitoring System